Fall Hydrant Inspection & Flushing Starts April 15

The Montclair Water Bureau will begin the spring hydrant inspection and flushing program on Monday, April 15. Flushing will be done during daytime hours, Monday through Friday, between 9:00 a.m. and 2:30 p.m. It will take approximately three weeks to complete.

The purpose of this program is to flush water mains, removing accumulated sediment in the lines and to operate, lubricate and test fire hydrants to ensure adequate fire protection.

There may be unavoidable discoloration of water and some loss of pressure during flushing in your area. Discolored water could occur at any time during the flushing period but more likely when hydrants are flushed in your neighborhood. This will be temporary and should clear up within a short period of time.

If you experience discolored water, open the cold water faucets on the lowest floor of the house and allow the water to run until it clears (usually within 30 minutes). Discolored or cloudy water is potable, but not desirable to use.

Residents are reminded to make sure that their water is running clear before washing laundry.