The Water Bureau will be shutting Lewellyn Road at the intersection of Wayside Place on11/19 and 11/20 From 9 am to 3 pm to do watermain repairs.
Parts of Grove St. will be re-routed from November 19 - 22 as part of a major gas line replacement from PSE&G. Click the link below for details and other streets affected during this time.
The Montclair Engineering Bureau is responsible for design and construction management for certain capital improvements to Township streets (curbs, paving and drainage/storm sewers) and parks.
Other responsibilities of the Engineering Bureau include permitting and inspections for road openings and construction of sidewalk, curb and driveway aprons; maintenance of the official street map; and assistance to residents with engineering-related matters.
Township Engineer 219 North Fullerton Avenue Montclair, NJ 07042
Phone: 973.509.5711
Hours: Monday-Friday 8:30 a.m. to 4:30 p.m.